Project: RANS21RB   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1990
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Jun 16, 2023     Strut fairings - (2.5 hours)       Category: Wings
Set up wing struts in position to locate upper strut to wing fairings. I didn't have the fairings ready to install when we first installed wings so I measured from the lower strut fuselage fitting to the front and rear spat attach fittings. Used this measurement to set position of strut as it would be when installed. Fit fairings and drilled for rivnuts. Also, hung flight controls on wall of hangar until paint.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.